{"id":1498,"date":"2026-09-16T18:02:45","date_gmt":"2026-09-16T18:02:45","guid":{"rendered":"https:\/\/mestric.com\/poka-yoke-v-proizvodnji\/"},"modified":"2026-09-16T18:02:47","modified_gmt":"2026-09-16T18:02:47","slug":"poka-yoke-v-proizvodnji","status":"publish","type":"post","link":"https:\/\/mestric.com\/hu\/poka-yoke-v-proizvodnji\/","title":{"rendered":"Six Shop Floor Poka Yoke Fixes to Cut Defects and Scale with MES"},"content":{"rendered":"<\/p>\n<p>Poka-yoke is a set of simple design techniques that prevent or immediately detect human errors at the source, cutting defects and rework. Rather than inspecting problems out after the fact, you design the process or the fixture so the mistake either cannot happen or gets caught the instant it occurs. It works best on manual assembly and high-volume repetitive tasks, where the same small slip repeats hundreds of times a shift, and it pays off through fewer defects, less rework, and a higher first-pass yield.<\/p>\n<hr>\n<blockquote>\n<p><strong>TL;DR:<\/strong><\/p>\n<ul>\n<li>Most small manufacturers can start with inexpensive mechanical or visual poka-yoke solutions like connector keying and color coding, which rarely fail and cost little to implement.<\/li>\n<li>Properly prioritizing failure modes using Pareto analysis and FMEA ensures efforts target the most costly or frequent errors, maximizing return on investment.<\/li>\n<li>A successful poka-yoke rollout depends on thorough observation, pilot testing, clear escalation rules, and operator training to prevent shortcuts or bypasses.<\/li>\n<li>Integrating poka-yoke with 5S, FMEA, SPC, and digital systems like MES enhances defect detection, sustainability, and enables real-time KPI tracking.<\/li>\n<li>Mechanical and visual fixes work well initially, but scaling effectiveness across shifts and variants benefits significantly from digital enforcement and measurement tools.<\/li>\n<\/ul>\n<\/blockquote>\n<hr>\n<div data-blg-cta=\"after_tldr\" data-blg-cta-layout=\"split\" style=\"margin:28px 0;font-family:-apple-system, BlinkMacSystemFont, &apos;Segoe UI&apos;, Roboto, Helvetica, Arial, sans-serif\">\n<div style=\"border-radius:26px;padding:min(22px,3.2vw);background:radial-gradient(circle at 100% 0%,#e3eeec 0 150px,rgba(255,255,255,0) 151px),radial-gradient(circle at 0% 100%,#e3eeec 0 130px,rgba(255,255,255,0) 131px),linear-gradient(180deg,#edf3f2 0%,#f6f9f9 100%)\">\n<div style=\"background:#ffffff;border-radius:18px;overflow:hidden\">\n<div style=\"display:flex;flex-wrap:wrap;background:linear-gradient(104deg,#243834 0%,#101817 33%,#ffffff 33.15%)\">\n<div style=\"flex:0 0 30%;min-width:150px;padding:30px 10px 30px 26px;color:#ffffff\">\n<div style=\"margin:0 0 14px\"><span style=\"display:inline-block;max-width:100%;border-radius:999px;padding:6px 13px;font-size:12px;font-weight:800;letter-spacing:0.1em;text-transform:uppercase;line-height:1.3;background:#ffffff;color:#304b46\">Mestric<\/span><\/div>\n<div style=\"font-size:12px;opacity:0.75\">mestric.com<\/div>\n<\/div>\n<div style=\"flex:1 1 300px;padding:30px 28px 30px 40px\">\n<div style=\"font-size:23px;font-weight:800;line-height:1.2;letter-spacing:-0.01em;color:#1f2937;margin:0\">Make Shop Floor Errors Visible<\/div>\n<div style=\"width:56px;height:6px;border-radius:3px;background:#669f94;margin:12px 0 14px\"><\/div>\n<div style=\"font-size:15px;line-height:1.55;color:#64748b;margin:0 0 22px\">Mestric connects with manufacturing equipment to track performance, quality, downtime, and costs in real time for informed decisions.<\/div>\n<p><a href=\"https:\/\/mestric.com\/hu\/\" style=\"display:inline-flex;align-items:center;gap:9px;border-radius:10px;font-weight:700;font-size:15px;text-decoration:none;padding:13px 22px 13px 26px;background:#669f94;color:#ffffff\">Explore Mestric<\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<h2 id=\"table-of-contents\" tabindex=\"-1\">Table of Contents<\/h2>\n<ul>\n<li><a href=\"#what-is-poka-yoke-and-what-principles-sit-behind-it\">What is poka-yoke and what principles sit behind it?<\/a><\/li>\n<li><a href=\"#what-types-of-poka-yoke-exist-and-which-examples-actually-work\">What types of poka-yoke exist and which examples actually work?<\/a><\/li>\n<li><a href=\"#how-do-you-introduce-poka-yoke-on-a-production-line-step-by-step\">How do you introduce poka-yoke on a production line step by step?<\/a><\/li>\n<li><a href=\"#how-does-poka-yoke-fit-with-5s-fmea-spc-and-digital-systems\">How does poka-yoke fit with 5S, FMEA, SPC and digital systems?<\/a><\/li>\n<li><a href=\"#where-do-poka-yoke-programmes-go-wrong-and-how-do-you-measure-success\">Where do poka-yoke programmes go wrong, and how do you measure success?<\/a><\/li>\n<li><a href=\"#how-does-a-connected-mes-strengthen-poka-yoke-on-the-shop-floor\">How does a connected MES strengthen poka-yoke on the shop floor?<\/a><\/li>\n<li><a href=\"#realistic-expectations-for-smaller-manufacturers\">Realistic expectations for smaller manufacturers<\/a><\/li>\n<li><a href=\"#scaling-poka-yoke-with-a-digital-system\">Scaling poka-yoke with a digital system<\/a><\/li>\n<li><a href=\"#sources\">Sources<\/a><\/li>\n<li><a href=\"#faq\">GYIK<\/a><\/li>\n<\/ul>\n<h2 id=\"what-is-poka-yoke-and-what-principles-sit-behind-it\" tabindex=\"-1\">What is poka-yoke and what principles sit behind it?<\/h2>\n<p>Poka-yoke was developed by Shigeo Shingo as part of the <a href=\"https:\/\/books.ung.si\/ptfmsi\/chapter\/japonski-proizvodni-model\/\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">Toyota Production System<\/a>, where it worked alongside jidoka, the practice of stopping a line the moment something goes wrong rather than letting a defect travel downstream. The Japanese term translates loosely as \u201cmistake proofing,\u201d and the idea is deliberately unglamorous: instead of training people to be more careful, you change the task so carelessness has nowhere to hide.<\/p>\n<p>Two design principles sit underneath every poka-yoke device you\u2019ll encounter:<\/p>\n<ul>\n<li><strong>Prevention<\/strong> stops the error from occurring at all, usually through a physical constraint that makes the wrong action impossible.<\/li>\n<li><strong>Detection<\/strong> lets the error happen but catches it immediately, triggering an alert or a stop before the part moves on.<\/li>\n<\/ul>\n<p>Shingo\u2019s own framing treated poka-yoke less as a single gadget and more as a philosophy that only works when paired with a broader lean mindset. That distinction matters for how you plan your rollout. A prevention device removes the failure mode entirely; a detection device still relies on someone or something responding correctly within seconds. Both belong in your toolkit, but they solve different problems, and conflating them is one of the more common planning mistakes production teams make early on.<\/p>\n<h2 id=\"what-types-of-poka-yoke-exist-and-which-examples-actually-work\" tabindex=\"-1\">What types of poka-yoke exist and which examples actually work?<\/h2>\n<p>Academic reviews of poka-yoke <a href=\"https:\/\/www.sv-jme.eu\/?ns_articles_pdf=%2Fns_articles%2Ffiles%2Fojs%2F6056%2Fsupp%2F6056-33252-1-SP.pdf&amp;lang=sl&amp;id=6338\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">group implementations into a small number of recurring categories<\/a>: physical or shape-control devices, sequence and flow controls, warning or detection systems, and informational aids that guide the operator without physically blocking anything. Each category trades off differently against cost, maintenance burden, and how much operator discipline it still relies on.<\/p>\n<p>Here are six examples worth knowing, roughly ordered from lowest to highest effort:<\/p>\n<ol>\n<li><strong>Connector keying.<\/strong> Asymmetric plugs, pins, or notches that make it physically impossible to insert a cable or component the wrong way round. Near-zero maintenance once designed; the cost sits entirely upfront in tooling.<\/li>\n<li><strong>Go\/no-go gauges.<\/strong> A simple pass or fail check, no measurement skill required. Cheap to produce, but they wear over time and need periodic recalibration against a master gauge.<\/li>\n<li><strong>Fixture design.<\/strong> Jigs shaped to accept only correctly oriented parts. Effective and durable, though a design change upstream can silently make the fixture obsolete if nobody updates it.<\/li>\n<li><strong>Torque-limiting tools.<\/strong> Drivers that click or disengage at a set torque, stopping over-tightening before it damages a joint. These need scheduled calibration, and Slovenian practitioner write-ups on poka-yoke <a href=\"https:\/\/www.mecalux.si\/blog\/poka-yoke\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">document torque limiters as one of the most commonly deployed devices<\/a> on assembly lines.<\/li>\n<li><strong>Pick-to-light systems.<\/strong> Lights above bins guide operators to the correct part in sequence, with a sensor confirming the pick. Higher upfront cost and some wiring or sensor maintenance, but strong for high-mix assembly.<\/li>\n<li><strong>Colour coding.<\/strong> Matching colours on components, fixtures, or work instructions to reduce mismatch errors. Very cheap to introduce, though it depends on operators having normal colour vision and being trained to look.<\/li>\n<\/ol>\n<p><strong>Profi tipp:<\/strong> <em>Start any new line with connector keying and fixture design before you touch anything electronic. A mechanical fix that physically cannot fail beats a sensor-based fix that occasionally does.<\/em><\/p>\n<h2 id=\"how-do-you-introduce-poka-yoke-on-a-production-line-step-by-step\" tabindex=\"-1\">How do you introduce poka-yoke on a production line step by step?<\/h2>\n<p>A poka-yoke rollout succeeds or fails on sequencing. Skipping the observation or pilot stage often leads to ineffective fixes that operators may bypass.<\/p>\n<ul>\n<li><strong>Observe the process and capture failure modes.<\/strong> Watch the actual work, not the work instruction. Log every slip, not just the ones that reach quality control.<\/li>\n<li><strong>Prioritise with Pareto analysis and FMEA.<\/strong> <a href=\"https:\/\/mfgguides.com\/quality-control-in-manufacturing\/\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">Pareto analysis helps identify the more frequent failure modes<\/a>, while FMEA scores each one for severity and how easily it\u2019s detected. Used together, Pareto tells you what happens most; FMEA tells you what matters most.<\/li>\n<li><strong>Design the simplest fix that solves the problem.<\/strong> Mechanical before electronic, visual before software. Complexity is a maintenance liability you\u2019ll be paying down for years.<\/li>\n<li><strong>Pilot on one line or one shift.<\/strong> Get direct operator feedback before you commit budget to a full rollout.<\/li>\n<li><strong>Measure the result.<\/strong> Track the specific defect rate the fix targets, not just a general quality score.<\/li>\n<li><strong>Document and train.<\/strong> A poka-yoke device without a written standard and a trained operator drifts back to the old failure within weeks.<\/li>\n<li><strong>Scale once the pilot holds.<\/strong> Roll out to other lines or shifts only after the pilot shows a sustained improvement.<\/li>\n<\/ul>\n<p>Set escalation rules before you go live, not after. Decide in advance who gets notified when a detection-type poka-yoke stops the line, how long a shift supervisor can leave it stopped before escalating further, and who has authority to override it in a genuine emergency. Without that clarity, operators either ignore the stop or escalate everything, and both outcomes defeat the purpose of the device.<\/p>\n<h2 id=\"how-does-poka-yoke-fit-with-5s-fmea-spc-and-digital-systems\" tabindex=\"-1\">How does poka-yoke fit with 5S, FMEA, SPC and digital systems?<\/h2>\n<p>Poka-yoke rarely works in isolation. It sits inside a wider quality system, and treating it as a standalone project is one of the more common ways implementations underdeliver.<\/p>\n<ul>\n<li><strong>5S comes first.<\/strong> A workstation that\u2019s cluttered or poorly labelled makes even a well-designed poka-yoke harder to use correctly, and combining 5S with poka-yoke and FMEA is consistently linked to lower defect rates in practitioner reports from smaller manufacturers, precisely because sorting and standardising the workspace removes the noise that hides real failure modes.<\/li>\n<li><strong>FMEA targets your effort.<\/strong> It ranks failure modes by severity, occurrence, and detectability, so you build poka-yoke devices against the failures that actually cost you money, not the ones that are simplest to fix.<\/li>\n<li><strong>SPC confirms the fix held.<\/strong> Control charts show whether a defect rate has genuinely dropped and stayed down, rather than dipping for a week before drifting back. This only works if the underlying gauge is trustworthy: a measurement system that records noise instead of signal will undermine an SPC rollout before it starts.<\/li>\n<li><strong>MES and WMS platforms enforce and capture.<\/strong> A manufacturing execution system can lock the next process step until a prior check is confirmed, log every instance electronically, and flag deviations in real time rather than relying on paper logs an operator might skip under pressure.<\/li>\n<\/ul>\n<p>Lean programmes that treat poka-yoke as one tool among several, <a href=\"https:\/\/leanscape.io\/lean-thinking\/top-lean-methodologies-for-corporate-transformation\" target=\"_blank\" rel=\"noopener\">rather than a standalone initiative<\/a>, tend to hold their gains longer because the surrounding discipline keeps reinforcing the fix.<\/p>\n<h2 id=\"where-do-poka-yoke-programmes-go-wrong-and-how-do-you-measure-success\" tabindex=\"-1\">Where do poka-yoke programmes go wrong, and how do you measure success?<\/h2>\n<p>Most failures trace back to three habits: over-engineering a fix when a simple one would do, skipping operator training so the device gets bypassed, and never reviewing feedback once the fixture is installed. A torque limiter operators find awkward will get defeated with a bit of tape within a month if nobody asks why.<\/p>\n<p>Build in maintenance from day one. Gauges drift, sensors fail, and fixtures wear, so schedule recalibration and keep spare parts on hand rather than discovering a failed poka-yoke during a defect spike. Any change to the part or process needs a change-control step that reviews whether the existing poka-yoke still applies.<\/p>\n<table>\n<thead>\n<tr>\n<th>Metric<\/th>\n<th>What it tells you<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Defect rate by failure mode<\/td>\n<td>Whether the specific error targeted actually dropped<\/td>\n<\/tr>\n<tr>\n<td>First-pass yield<\/td>\n<td>Overall assembly quality without rework<\/td>\n<\/tr>\n<tr>\n<td>Time to detect<\/td>\n<td>How quickly a poka-yoke catches an error after it occurs<\/td>\n<\/tr>\n<tr>\n<td>Cost of poor quality (COPQ)<\/td>\n<td>Total financial impact of scrap, rework and warranty claims<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Profi tipp:<\/strong> <em>Track defect rate by failure mode, not a blended quality score. A blended number can mask one fixture quietly failing while others compensate.<\/em><\/p>\n<h2 id=\"how-does-a-connected-mes-strengthen-poka-yoke-on-the-shop-floor\" tabindex=\"-1\">How does a connected MES strengthen poka-yoke on the shop floor?<\/h2>\n<p>A manufacturing execution system extends what a physical poka-yoke device can do on its own. Where a fixture stops one operator from making one mistake, an MES enforces the sequence across the entire line and refuses to release the next step until the prior check registers as complete.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/mestric.com\/wp-content\/uploads\/2026\/09\/1789581692090_MES-enforced-poka-yoke-production-sequence.jpeg\" alt=\"MES-enforced poka-yoke production sequence\"><\/p>\n<p>You also get the measurement side for free. Real-time dashboards surface defect trends by station and by failure mode as they happen, rather than waiting for a weekly quality report, and instant alerts flag a deviation the moment it occurs rather than the moment someone notices it. That combination of enforcement and visibility is exactly what turns a handful of good poka-yoke devices into a system you can actually verify is working. An onsite demonstration on your own line, using your own failure data, tends to make the case faster than any spec sheet.<\/p>\n<h2 id=\"realistic-expectations-for-smaller-manufacturers\" tabindex=\"-1\">Realistic expectations for smaller manufacturers<\/h2>\n<p><img decoding=\"async\" src=\"https:\/\/mestric.com\/wp-content\/uploads\/2026\/09\/1789581744332_Realistic-expectations-for-smaller-manufacturers-overview-diagram.jpeg\" alt=\"Realistic expectations for smaller manufacturers \u2014 overview diagram\"><\/p>\n<p>Most SME teams don\u2019t have the budget for sensor-heavy fixes on day one, and that\u2019s fine. Start with mechanical or visual poka-yoke: connector keying, fixture design, colour coding. These cost little and fail rarely.<\/p>\n<p>Operator buy-in matters more than the device itself. A fixture that slows people down gets defeated quietly, so ask for feedback before you finalise the design, not after. Measure the first fix properly, show the defect rate drop to the floor, then use that win to justify the next one. Scaling from proven results beats scaling from ambition.<\/p>\n<blockquote>\n<p><em>\u2014 Andra\u017e<\/em><\/p>\n<\/blockquote>\n<h2 id=\"scaling-poka-yoke-with-a-digital-system\" tabindex=\"-1\">Scaling poka-yoke with a digital system<\/h2>\n<p>Mechanical and visual poka-yoke fixes solve the failure modes you can catch by watching the line. Scaling them across multiple shifts, stations, and product variants is a different problem, and it\u2019s where a digital layer earns its place. A manufacturing execution system enforces the sequence controls your poka-yoke design depends on and captures the KPI data (defect rate by failure mode, first-pass yield, time to detect) automatically, rather than relying on someone filling in a paper log at the end of a shift.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/mestric.com\/wp-content\/uploads\/2026\/09\/1771068359718_mestric.jpg\" alt=\"Mestric\"><\/p>\n<p>If you\u2019re weighing up whether a <a href=\"https:\/\/mestric.com\/hu\/mes-vs-traditional-manufacturing-boost-efficiency-2026\/\" target=\"_blank\" rel=\"noopener\">manufacturing execution system<\/a> makes sense for your line, Mestric offers onsite demonstrations that show real-time dashboards and alerts running against your own equipment, not a sample data set. Request a demo to see how your current poka-yoke fixes could translate into tracked, verifiable KPIs.<\/p>\n<h2 id=\"sources\" tabindex=\"-1\">Sources<\/h2>\n<ul>\n<li><a href=\"https:\/\/books.ung.si\/ptfmsi\/chapter\/japonski-proizvodni-model\/\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">Japonski proizvodni model \u2013 Tehnike za analizo in re\u0161evanje problemov<\/a><\/li>\n<li><a href=\"https:\/\/www.sv-jme.eu\/?ns_articles_pdf=%2Fns_articles%2Ffiles%2Fojs%2F6056%2Fsupp%2F6056-33252-1-SP.pdf&amp;lang=sl&amp;id=6338\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">Systematic literature review on Poka\u2011Yoke<\/a><\/li>\n<li><a href=\"https:\/\/asq.org\/quality-resources\/quality-assurance-vs-control\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">Quality assurance vs quality control \u2014 ASQ<\/a><\/li>\n<li><a href=\"https:\/\/mfgguides.com\/quality-control-in-manufacturing\/\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">Quality control in manufacturing \u2014 MFG Guides<\/a><\/li>\n<\/ul>\n<h2 id=\"faq\" tabindex=\"-1\">GYIK<\/h2>\n<h3 id=\"what-is-poka-yoke-in-simple-terms\" tabindex=\"-1\">What is poka-yoke in simple terms?<\/h3>\n<p>Poka-yoke is a design technique that prevents a human error from happening or catches it immediately after it occurs, before a defective part moves to the next step.<\/p>\n<h3 id=\"is-poka-yoke-the-same-as-quality-control\" tabindex=\"-1\">Is poka-yoke the same as quality control?<\/h3>\n<p>No. Poka-yoke is a preventive quality assurance approach built into the process design, while <a href=\"https:\/\/asq.org\/quality-resources\/quality-assurance-vs-control\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">quality control is inspection after the fact<\/a>; the two work together but solve different problems.<\/p>\n<h3 id=\"what-is-the-difference-between-prevention-and-detection-poka-yoke\" tabindex=\"-1\">What is the difference between prevention and detection poka-yoke?<\/h3>\n<p>Prevention devices make the error physically impossible, such as a keyed connector, while detection devices let the error occur but flag or stop it immediately, such as a sensor triggering an alert.<\/p>\n<h3 id=\"how-do-you-decide-which-failure-mode-to-fix-first\" tabindex=\"-1\">How do you decide which failure mode to fix first?<\/h3>\n<p>Use Pareto analysis to find the most frequent failure modes, then score them with FMEA for severity and detectability to identify the highest-value fix.<\/p>\n<h3 id=\"can-a-small-manufacturer-afford-to-implement-poka-yoke\" tabindex=\"-1\">Can a small manufacturer afford to implement poka-yoke?<\/h3>\n<p>Yes. Most effective poka-yoke fixes, such as fixture design or colour coding, are mechanical or visual and require minimal investment, which is why smaller producers frequently start there before adding digital tools like an MES.<\/p>\n<h2 id=\"recommended\" tabindex=\"-1\">Aj\u00e1nlott<\/h2>\n<ul>\n<li><a href=\"https:\/\/mestric.com\/hu\/how-to-optimise-shop-floor-efficiency-measurable\/\" target=\"_blank\" rel=\"noopener\">How to optimise shop floor efficiency for measurable results<\/a><\/li>\n<li><a href=\"https:\/\/mestric.com\/hu\/what-is-zero-defect-manufacturing\/\" target=\"_blank\" rel=\"noopener\">What is zero-defect manufacturing: a complete guide<\/a><\/li>\n<li><a href=\"https:\/\/mestric.com\/hu\/how-to-improve-manufacturing-efficiency-mes-tools\/\" target=\"_blank\" rel=\"noopener\">How to Improve Manufacturing Efficiency with MES Tools<\/a><\/li>\n<li><a href=\"https:\/\/mestric.com\/hu\/examples-of-yield-improvement-strategies\/\" target=\"_blank\" rel=\"noopener\">Yield improvement strategies: practical examples for plant managers<\/a><\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Shop floor poka yoke playbook for plant managers: six proven fixes, a pilot checklist, FMEA\/5S\/SPC alignment, and how MES measures and scales results.<\/p>","protected":false},"author":1,"featured_media":1499,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1498","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-learn"],"acf":[],"_links":{"self":[{"href":"https:\/\/mestric.com\/hu\/wp-json\/wp\/v2\/posts\/1498","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mestric.com\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mestric.com\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mestric.com\/hu\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mestric.com\/hu\/wp-json\/wp\/v2\/comments?post=1498"}],"version-history":[{"count":1,"href":"https:\/\/mestric.com\/hu\/wp-json\/wp\/v2\/posts\/1498\/revisions"}],"predecessor-version":[{"id":1502,"href":"https:\/\/mestric.com\/hu\/wp-json\/wp\/v2\/posts\/1498\/revisions\/1502"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mestric.com\/hu\/wp-json\/wp\/v2\/media\/1499"}],"wp:attachment":[{"href":"https:\/\/mestric.com\/hu\/wp-json\/wp\/v2\/media?parent=1498"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mestric.com\/hu\/wp-json\/wp\/v2\/categories?post=1498"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mestric.com\/hu\/wp-json\/wp\/v2\/tags?post=1498"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}